When asphalt plants are open, the proper repair is as follows: saw cut around the failed area, remove the asphalt, inspect and re-compact the subbase, tack the perimeter walls, install new hot mix asphalt in two lifts compacting after each lift, and then crack seal around the patch to prevent water infiltration around the patch area.